Proof of sediment flushing sought
By John Edens, on Thursday 20 May 2010
Southland Times
Contact Energy should provide proof of sediment flushing in the Clutha catchment, the president of the Alexandra District Flood Action Society said yesterday.
During the floods last month, when Lake Wakatipu spilled into Queenstown, Contact monitored heavy flows at Alexandra and downstream of the Roxburgh dam.
Spillways were opened and Lake Roxburgh dropped by 6m to cope with rising river levels.
By reducing the lake level, combined with fast flows, it creates a steeper gradient from Alexandra to the Roxburgh dam and sediment is flushed further up Lake Roxburgh and beyond, according to Contact.
Alexandra District Flood Action Society president Stan Randle yesterday said he disputed flushing claims because he could not obtain hydrological data.
"They say it's successful but we don't know. To my mind it's like a sand dune effect.
"It's so open-ended and tenuous " Mr Randle said.
He called for Contact to provide proof of sediment flushing.
A Contact Energy spokeswoman said the firm planned to commission a lakebed survey next July to measure the amount of sediment flushed from Lake Roxburgh.
During the flood last month Clutha river readings were higher downstream of the Roxburgh dam than at Alexandra, indicating "flushing was successful," she said.
The Southland Times asked Contact for the last lakebed hydrological survey, carried out in July last year, and was told "No." "The survey comprises a large amount of numerical data which can really only be used to build up a long term trend," a statement says.
In 2007 the Environment Court granted Contact consents to operate at Clyde, Roxburgh and Hawea for 35 years.
The firm agreed to offer compensation to any Alexandra residents affected by flood during Contact operations.
There is no specific consent stipulating flushing of the Clutha but the consents allow the lowering of Lake Roxburgh, in accordance with the district's flood management plan.
The energy firm said flushing was done during high flows between April 26 and May 13.
Sediment buildup in the Clutha increased after the Roxburgh dam was built in 1956.
Showing posts with label Flushing. Show all posts
Showing posts with label Flushing. Show all posts
Thursday, May 20, 2010
Proof Of Sediment Flushing Sought
Labels:
Contact Energy,
Flushing,
Roxburgh Dam,
Silting Up
Subscribe to:
Posts (Atom)